City Progress Report
Updates are made in real time

Changing views requires additional loading time
Administration
NameProject DescriptionPriorityProject ManagerProject CategoryTimelineStatus% CompleteProject CostBudget Available
City Logo ContestIn an effort to build positive brand recognition and awareness and provide standards for consistently representing the City, a new city logo is being sought through a logo contest. The contest is open to all. HighJohanna FerrieraMarketing10.05.18 - 04.16.19 In Process95$600.00$600.00
Manteca Family NightMarketing of Manteca Family Night HighJohanna FerrieraMarketing10.03.18 - 06.28.19 In Process5$.00$.00
Master Property Tax NegotiationsRenegotiate the Property Tax Sharing agreement with San Joaquin County for newly annexed areas. HighTim Ogden12.05.17 - 06.29.18 In Process20$.00$.00
City Clerk
NameProject DescriptionPriorityProject ManagerProject CategoryTimelineStatus% CompleteProject CostBudget Available
Citywide Records Management ProgramManaging records and information, including structured business processes and controls for managing and protecting information assets throughout their life cycle, and providing transparency to the citizens and support to internal departments. HighLisa BlackmonEffective & Efficient Government07.04.17 - 06.30.21 In Process10$300,000.00$140,000.00
Electronic Agreement ExecutionElectronic signature software will increase efficiency, ensure legal compliance, provide real time processing with vendors/consultants, and eliminates the wet signature requirement. HighLisa BlackmonEffective & Efficient Government02.01.19 - 06.28.19 Under Development0$10,000.00$10,000.00
Community Development
NameProject DescriptionPriorityProject ManagerProject CategoryTimelineStatus% CompleteProject CostBudget Available
General Plan UpdateUpdate of the General Plan to plan for growth over the next 20-years. HighJ.D. HightowerReport06.01.17 - 04.30.19 In Process75$800,000.00$820,000.00
General Plan Envrionmental Impact ReportEnvironmental Impact Report for the General Plan Update On HoldJ.D. HightowerReport03.01.19 - 12.31.190
Atherton Gap Improvement Project - ConstructionConstruct Atherton Drive from Union Road to Sparrowhawk Street HighGreg ShowermanConstruction01.01.18 - 02.28.19 In Process95$4,447,528.00$4,905,000.00
Permit/Project SoftwareComprehensive plan check, permitting, and inspection software HighBrad WungluckSoftware01.01.18 - 12.31.19 In Process25$5,500.00$325,000.00
Citywide Truck Route StudyThe Citywide Truck Route Study is moving forward with Fehr & Peers MediumJ.D. HightowerReport06.01.18 - 03.29.19 In Process65$119,000.00$125,000.00
2018 PFIP Sewer, Water and Storm Drain Update - RFP / Consultant SelectionIn accordance with the 2013 Public Facilities Implementation Plan Update, perform the 2018 major five year update. Under DevelopmentGreg ShowermanStudy07.02.18 - 06.28.19 Under Development70$368,750.00
French Camp Outlet Canal Master Plan StudyMaster Plan for the FCOC identifying capacity, constraints, and recommended improvements HighGreg ShowermanReport04.10.18 - 03.29.19 In Process65$310,000.00$310,000.00
Daniels Street Extension Project - Improvement Plans & SpecificationsPrepare Improvement Plans to construct Daniels Street from the current terminus west of Costco to McKinley Ave. in anticipation of Great Wolf Lodge opening HighGreg Showerman / Brad WungluckDesign05.15.18 - 12.31.19 In Process98$420,000.00$440,125.00
Manteca Library Roof RepairConstruction project to replace the existing 30+ year old roof, replace dry rotted matterial, and apply fresh paint to the trim and soffit HighGreg ShowermanConstruction07.02.18 - 02.28.19 In Process85$355,135.00$500,000.00
User Fee Study Update (Planning, Engineering, Building, and Fire Prevention)Update user fees of Planning, Engineering, Building Safety, and Fire Prevention to ensure accurate fees compared to expenses Budget PrepBrad WungluckStudy11.01.18 - 07.01.19 In Process55$15,000.00$15,000.00
Great Wolf Lodge Plan Review and InspectionsPlan Review and Inspection of Great Wolf Lodge - Coordinate consultants regarding the plan check of submittals, RFI's, etc. and inspections on site for Building, Engineering, and Fire Prevention HighBrad WungluckConstruction07.02.18 - 04.30.20 In Process30$950,000.00$950,000.00
Electronic Plan Review SoftwareAddition of Software to allow for electronic plan review and submittals HighBrad WungluckSoftware01.01.19 - 06.28.19 In Process70$50,000.00
Daniels Street Extension Project - ConstructionExtend Daniels Street from the current terminus at Costco to McKinley Avenue HighBrad WungluckConstruction03.25.19 - 01.06.20 In Process2$9,463,110.00$10,882,575.00
Economic Development
NameProject DescriptionPriorityProject ManagerProject CategoryTimelineStatus% CompleteProject CostBudget Available
Auction/Sale of former Redevelopment PropertiesAuction of 3 Successor Agency sites (1115 S. Airport, 682 S. Main, 555 Industrial Park) and 1 Housing Successor site (282 N. Airport) HighDon SmailProperty Sale12.01.14 - 09.28.18 In Process90
Wayfinding Sign ProgramReview initial plan for wayfinding signs, update the plan, and execute MediumRandy SaffoldCity Marketing10.01.18 - 05.01.19 In Process80
Downtown Parking Lot and Alleyway ConstructionConstruction for the rehabilitation of 4 city-owned parking lots, 6 privately-owned parking lots, and 4 city-owned alleyway sections in the downtown area. HighJohanna FerrieraConstruction11.20.18 - 09.11.19 In Process10$850,000.00$850,000.00
Economic Development PlanWorking with the Economic Development Committee, the Economic Development Plan will assist with the expansion of economic development activities and opportunities. HighDon Smail, Randy Saffold, Johanna FerrieraPlanning06.01.18 - 05.31.19 In Process80
Great Wolf Lodge HighTim Ogden, Don Smail11.12.18 - 05.29.20 In Process
Family Entertainment Zone Master PlanUpdate the Family Entertainment Zone Master Plan to revise land uses and add additional areas. HighDon Smail, Johanna FerrieraFEZ03.04.19 - 05.31.19 Under Development0
Fiber PlansWork with Telcoms, Businesses, and Stakeholders to develop fiber options throughout the community. MediumRandy SaffoldPlanning07.31.18 - 07.11.19 In Process60
Downtown: Micro-enterprise loans, facade improvementsDevelop a downtown Facade Improvement loan program and a micro-enterprise loan program to assist with downtown revitalization. Both programs are CDBG funded. HighJohanna FerrieraPrograms02.19.19 - 06.06.19 In Process50$230,820.00$230,820.00
Family Entertainment Zone: AnnexationsAnnexation of properties along S. McKinley Avenue between SR 120 and UP Railroad tracks. HighFEZ01.15.19 - 08.30.19 In Process
Family Entertainment Zone: Milo CandiniDesign for the extension of Milo Candini from its terminus to the north of Big League Dreams to Airport Way. MediumFEZ Under Development
Finance
NameProject DescriptionPriorityProject ManagerProject CategoryTimelineStatus% CompleteProject CostBudget Available
Budget SoftwareMulti-user budgeting software to assist and simplify the tracking, analyzing and reporting of the City's Operating and Capital Budget. HighTracie MadisonDesign07.02.18 - 03.01.19 In Process90%$12,500.00$12,500.00
Interactive Voice Response (IVR)Automated phone system to assist callers in accessing information via touchtone key-pad or speaking to the phone. HighAmber ShipmanTechnology01.07.19 - 03.29.19 In Process
Transient Occupancy Tax (TOT)Tax charged to travelers for rental accomodations in a hotel, inn, tourist home, or house, motel HighAmber Shipman03.01.19 - 03.29.19 In Process
Fire Department
NameProject DescriptionPriorityProject ManagerProject CategoryTimelineStatus% CompleteProject CostBudget Available
Fire Station No. 5-ConstructionConstruct Fire Station No. 5 at the northwest corner of Atherton and Woodward. Call volume in this area has increased significantly as the area has developed. This station will handle the area south of 120 and east of Main Street. Additionally the station will respond to calls on Highway 99 (NB and SB between Yosemite and Jack Tone) and State Route 120 (east of Main). In 2017 the Station No. 5 First Due District had 967 calls for service. We expect this to continue to rapidly increase as more homes are added. Construction of the Station will take approximately 18-20 months from the time the funds are allocated. If the station were funded today, it is likely that we will have over 1,200 calls for service in the area by the time the station opens. HighLantz ReyCapital07.02.18 - 03.31.20 In Process30$4,500,000.00$4,500,000.00
Replacement RMS systemThe department has used Firehouse RMS for records management for 15 years. The program is antiquated, unreliable and customer support is non-existent. Firehouse was purchased by another company in July of 2017 with the intent of transitioning existing customers away from Firehouse and onto their platform. Fire Staff has reviewed the other company's product and is not interested in moving forward. MediumDavid MarquesTechnology07.02.18 - 06.28.19 In Process10$33,000.00$33,000.00
Fire Facility Fee UpdateThe Fire Facility Fee was last updated in 2011. It's recommended that these fees be adjusted every 5 years. The fee is intended to ensure development helps to pay for the construction of new fire stations as needed. HighLantz Rey07.02.18 - 01.01.19 In Process0$25,000.00$25,000.00
Anti-Overdose EMS protocolThe new EMS protocol will allow MFD personnel to administer the anti-overdose drug, Narcan. Additionally, the EMS protocal will allow our personnel to now adminsiter epinephrine for persons with life threatening allergic reactions. In ProcessDavid MarquesEMS01.01.18 - 12.31.18 In Process85$9,000.00$9,000.00
Revised Policy and Procedure ManualThe department's policy and procedures manual is out of date and not in compliance with city policy and fire department best practices. In ProcessChris JelinekAdministration12.01.17 - 03.29.19 In Process70$7,000.00$7,000.00
Update Disptach TechnologyIncludes the implementation of a new Computer Aided Dispatch System at our contract Disptach Center, On engine Mobile Disptach ipads, and GPS vehicle location. The updated technology will allow for the closest avalialbe fire resource to be dispatched to an emergency. This technology is expected to help improves response time. In ProcessLantz ReyTechnology07.03.17 - 01.01.19 In Process75$50,000.00$50,000.00
Security Gates at StationsThis is the combination of three Capital projects; security gates have been requested at station no. 1 and 3. In the FY 18/19 budget we have requested the third and final gate at station no. 2. LowBill CanfieldCapital01.01.18 - 06.28.19 Behind Schedule5$81,000.00$81,000.00
Telestaff UpgradeTelestaff is the software program used by Fire and Police for staffing. The server that currently services this software program is over ten years old and in need of replacement. In ProcessChris JelinekTechnology01.01.18 - 06.29.18 Behind Schedule0
New Fire EngineCreate specifications, conduct bid process and purchase new type 1 fire engine (from allocation of funds to delivery is approx. 1 year). MediumBill CanfieldLarge Equipment07.02.18 - 06.28.19 Unfunded0$600,000.00
Standards of CoverThe project proposes to conduct a professional study on field deployment and headquarters staffing. The proposed study will address the adequacy of the existing deployment of resources and identify potential deficiencies in headquarter operations. Additionally, the proposed study will identify areas where the department exceeds or is deficient, based on accepted best practices and national standards. Further the Study will address the potential economic impacts associated with losing a business that generates tax revenue for the City. MediumChris JelinekAdministration07.01.19 - 11.01.19 Unfunded0$50,000.00
Public Safety Training Facility555 Industrial Park (Qualex) is no longer available to Public Safety for training. The Fire Department used this facility for numerous types of training in the past including using the building for primary fire attack, search and rescue, roof ventilation, firefighter survival, driver operator course, and ladders. The proposed tower would meet this need until a permanent joint public safety training facility can be designed and funding for construction identified. MediumDavid Marques07.01.19 - 06.26.20 Unfunded0$550,000.00
Communications Upgrade/RepairThis is a combination of multiple communication projects, including: new radio tower at station no. 3, connection of fiber optics from the transit center to fire station no. 1 (and the water well), backup data connections for stations 2,3,4. MediumBill Canfield07.01.19 - 06.26.20 Unfunded30$86,000.00
Human Resources/Risk Managment
NameProject DescriptionPriorityProject ManagerProject CategoryTimelineStatus% CompleteProject CostBudget Available
Americans with Disability Act Transition PlanThe ADA transition plan process will being around March. A comprehensive study of all sidewalks and walkways was completed in 2017; the transition plan will identify priorities to repair and update areas that do not meet all the criteria of the new codes. On HoldJoe KriskovichADA03.19.18 - 03.01.21 On Hold
City Wide Tree InventoryWorking with Parks Maintenance Department to develop an RFP for categorizing and identifying all city trees and their corresponding locaitions within the city. HighJoe Kriskovich/Cody RossRisk06.01.18 - 06.28.19 In Process$140,000.00
Police Officer RecruitmentRecruitment of Police Officers HighDawn LichtiRecruitment02.01.18 - 08.01.18 In Processongoing
Citywide Total Compensation StudyA Request for Proposal will be sent to qualifed vendors on September 4, 2018 for conducting a citywide compensation study. The resutls of the study should be available mid December 2018. HighJoe KriskovichHuman Resources09.04.18 - 12.17.18 In Process$50,000.00
Information Technology
NameProject DescriptionPriorityProject ManagerProject CategoryTimelineStatus% CompleteProject CostBudget Available
GIS - Web Viewer/PortalGIS Viewer Builds Internal/External HighPennie ArounsackDesign02.04.19 - 02.15.19 In Process99
GIS - Address Inventory ProjectX/Y Collection of All City Addresses MediumPennie ArounsackPlanning01.31.20 - 02.01.20 In Process30
GIS - ArcGIS Pro MigrationMigrating To New Pro Architecture MediumPennie ArounsackSoftware01.01.18 - 12.31.18 In Process25
GIS - GIS Page and HUBCreation of New GIS Page and HUB MediumPennie ArounsackDesign06.30.17 - 07.01.18 In Process50
IT Master Plan MediumSophal RosPlanning12.18.18 - 04.30.19 On Hold$40,000.00
Network Switch Upgrades MediumSophal RosHardware02.06.18 - 01.10.19 In Process85$30,000.00$30,000.00
Phone System Server UpgradeBuild new email server and migrate database MediumSophal RosHardware/Software04.10.18 - 03.29.19 On Hold
Police CAD System UpgradeUpgrade and data conversion from Microsoft Platform to Enterprise CAD HighPennie ArounsackSoftware07.19.17 - 10.31.18 In Process99
Police/Fire Scheduling Software UpgradeUpgrade Public Safety Scheduling System to Cloud-Based System HighPennie ArounsackSoftware01.08.18 - 01.07.19 In Process15$51,058.00$51,058.00
Web Site Platform MigrationMove from HTML/.NET hybrid to SharePoint 2016 MediumWill WebbDesign01.26.18 - 01.31.19 On Hold50
Transit Center A/V RepairsBrian GunnPlanning11.01.18 - 02.15.19 On Hold$30,000.00$.00
Parks & Recreation
NameProject DescriptionPriorityProject ManagerProject CategoryTimelineStatus% CompleteProject CostBudget Available
Golf Clubhouse Exterior Staircase Structure RestorationRemoval and replacement of two existing staircases due to disrepair/rot HighMichael RosalesConstruction09.24.18 - 04.19.19 In Process75$88,000.00$100,000.00
Northgate Picnic Area Renovation - PlanningRemoval and replacement of existing shelter, restroom renovation and general site improvements HighMichael RosalesDesign11.01.18 - 06.28.19 In Process25$1,150,000.00
Senior Center ImprovementsBathroom/Entry Improvements and other miscellaneous building improvements HighMichael RosalesConstruction01.28.19 - 05.07.19 In Process50$526,200.00$654,990.37
BMX Track RenovationBMX Track renovation HighMichael RosalesBidding03.12.19 - 04.01.19 In Process95$5,000.00$60,000.00
Union Tennis Court Surface and Crack RepairCrack repair and resurfacing of tennis courts MediumMichael RosalesConstruction03.25.19 - 04.30.19 In Process15$140,000.00
Diamond Oaks Playground RestorationReplacement of antiquated play equipment within the 2-5 and 5-12 play areas at Diamond Oaks Park. Addition of play ramps, seatwalls and engineered wood fiber to the play areas. MediumMichael RosalesConstruction02.04.19 - 04.12.19 In Process90$160,426.15$162,630.00
Tidewater Bike Trail Re-surfacingResurfacing of the Tidewater Bike trail from Spreckels Ave to West Lathrop Road. MediumMichael Rosales/ (PW)Bidding On Hold0$120,000.00
Lincoln Park - Picnic Tables and Shade CanopyAdd additional tables and shade structure LowMichael RosalesPlanning On Hold0$20,000.00
Union Tennis Court Screen ReplacementReplace the screens on the tennis court fencing LowMichael RosalesConstruction75$5,745.75$10,000.00
Citywide Tree InventoryInventory of existing owned/maintained trees City wide HighCody Ross/Kevin FantTree Inventory04.15.19 - 08.18.19 In Process0$125,000.00
Central Irrigation Controller UpgradesReplacement of 23 Motorola Centralized Irrigation Controllers MediumCody RossConstruction07.01.18 - 04.26.19 In Process$37,851.34$38,000.00
Parks and Recreation Master Plan ImplementationFeasibility Study for the top 3 items in the master plans and to identify potential locations and prepare cost estimates for Pool/Aquatic Center, Gymnasium/Recreation Center, Sports Fields. HighKevin Fant/Toni LundgrenPlanning/Design10.17.18 - 04.19.19 In Process60$185,000.00$185,000.00
Lincoln Pool Maintenance, Upgrades and RenovationsLincoln Pool Renovations to include new skimmers, fiberglass finishing, new tile and new heater MediumCody RossPlanning On Hold0$80,000.00
Civic Center Turf RemovalRemoval of areas of existing turf and replacement with drought tolerant landscaping On HoldMichael RosalesNone Unfunded0$105,000.00$.00
Parks and Recreation Revenue Ballot Measure PreparationConsultant contract to assist staff with a tax measure feasability survey to help determine ballot measure viability and consultant services through a revenue ballot measure process for the 2020 general election cycle. On HoldKevin Fant/Toni LundgrenPlanning Unfunded0$130,000.00$.00
Library Park Spray Pad Retrofit and Restroom UpgradeRenovation to existing spray pad from flow-through system to treated re-circulation system On HoldMichael RosalesPlanning Unfunded0$765,000.00$.00
Woodward Community Park - Concession and Restroom BuildingsInstallation of concession and restroom building in north west side of park On HoldMichael RosalesPlanning Unfunded0$1,050,000.00$.00
Woodward Community Park - Picnic UpgradesAddition of small Picnic shade shelters, tables and barbecues. On HoldMichael RosalesPlanning Unfunded0$285,000.00$.00
Golf Club House RenovationsReplace carpet/flooring, and blinds/window coverings upstairs in the clubhouse at the Golf Course. On HoldToni LundgrenPlanning Unfunded0$160,000.00$.00
Golf Course Cart PathsFourth and final phase of construction of concrete cart paths from green to tee for holes 4 through 9. On HoldJoe VolkPlanning Unfunded0$590,000.00$.00
Recreation Office RenovationParks & Recreation Office Renovations which would include: office paint, new carpet, new office furniture, new office counters, and blinds/shades, to meet ADA standards. On HoldToni LundgrenPlanning Unfunded0$350,000.00$.00
Police Department
NameProject DescriptionPriorityStatusProject ManagerProject CategoryTimeline% CompleteProject CostBudget Available
Police Department Front Lobby RenovationConstruction changes to ensure safety and ergonomical environment in records is improved. In ProcessEstarziau/Goeken/SchluerConstruction01.05.18 - 12.04.18 In Process10$25,000.00
Critical Incident Protocal Investigative ChangesWMPD currently working with countywide committee to make changes In ProcessGoeken/Miller/SchluerPolicy Changes10.10.18 - 02.26.19 In Process80
Telestaff UpgradeTelestaff is the software program used by Police and Fire for staffing. The server that currently services this software program is over ten years old and in need of replacement. In ProcessPaul CarmonaEquipment01.30.19 - 05.01.19 In Process50
New VehiclesIn order to maintain a safe and efficient police fleet, the department is looking to purchase 3 new marked (black and white) police cars, 2 new unmarked police vehicles for our special assignment units and 1 Harley Davidson police motorcycle for the traffic unit. In ProcessPaul CarmonaEquipment01.30.19 - 04.01.19 In Process75$266,000.00$266,000.00
License Plate Readers (LPR)Have license plate readers installed in the City In ProcessCharlie GoekenEquipment11.06.18 - 04.15.19 In Process40$400,000.00$400,000.00
Public Works
NameProject DescriptionPriorityProject ManagerProject CategoryTimelineStatus% CompleteProject CostBudget AvailablePerson
Springtime Estates Improvement Project-DesignPavement repairs at the Springtime Estates Subdivision. MediumNathan DahlenPS&E04.16.19 - 06.28.19 In Process30$46,000.00$120,000.00
McKinley Property Demolition Phase 3 (APN 241-410-21)Demolish structures for new highway overcrossing In ProcessNathan DahlenConstruction03.19.19 - 04.30.19 In Process95$50,000.00$75,000.00
Airport - Yosemite to Daniels - Env. ClearanceWidening Airport Way from Yosemite Avenue to Daniels Street MediumNathan DahlenEnvironmental01.02.18 - 03.30.19 In Process50$2,460,000.00
SR120/McKinley Ave Interchange (IC) Project - Design & R/WDesign, Env. Clearance and R/W Acquisition HighKoosun KimDesign07.01.16 - 06.28.19 In Process90$19,500,000.00$19,500,000.00
SR120/McKinley Ave Interchange (IC) Project - ConstructionConstruct a New IC with On & Off-Ramps HighKoosun KimConstruction08.01.19 - 09.30.20 Under Development0$25,300,000.00$25,300,000.00
SR120/Union Road Interchange (IC) Project - ConstructionConstruct a Diverging Diamond IC (DDI) HighKoosun KimConstruction03.29.19 - 05.29.20 In Process5$25,100,000.00$25,100,000.00
Woodward & Wellington/Pillsbury Ave Ped Crossing-ConstructionInstall Flashing Beacon and LED Stop Signs HighKoosun KimConstruction05.21.18 - 01.31.19 In Process35$350,000.00$750,000.00
Traffic Signal UpdateAssess the existing traffic signals and develop a plan for replacing and updating traffic signals timing. In ProcessKoosun KimPS&E08.23.17 - 04.30.20 In Process40$478,000.00$450,000.00
Retroreflective Traffic Sign ProjectDevelop and implement a plan to maintain traffic signs in accordance with CMUTCD Section 2A.08. In ProcessKoosun KimPS&E08.01.17 - 04.30.20 In Process40$382,000.00$400,000.00
Main Street Widening Feasibility Study: Yosemite Ave to Alameda StProject Approval and Environmental Clearance HighKoosun KimFeasibility Study01.01.18 - 12.31.18 In Process90$48,648.00$1,000,000.00
Yosemite Avenue: Main Street to Cottage Avenue-ConstructionConstruction: Repair and resurface roadway HighKoosun KimConstruction10.25.18 - 10.31.19 In Process10$3,054,000.00$3,054,000.00
Main Street: Yosemite Avenue to Atherton Drive-ConstructionConstruction: Repair and Resurface roadway HighKoosun KimConstruction10.01.18 - 10.31.19 In Process15$3,445,000.00$3,445,000.00
1,2,3-TCP Mitigation ProjectDesign Build Potable Water Well Treatment In ProcessGeorge MontrossDesign Build08.09.18 - 03.19.21 In Process20$14,388,176.00$15,130,175.00
Public Works Department Administration BuildingPublic Works Consolidation in a new building In ProcessGeorge MontrossDesign05.01.18 - 12.31.19 In Process10$987,570.00$1,500,000.00
Well 30-Nile Garden Project Grant ApplicationGrant application for new potable water well In ProcessElba MijangoPlanning04.03.18 - 10.31.19 In Process15$5,133,000.00
Well 28 & 29 Equipping Project Construction (CIP 13007)Construction management of two well sites HighElba MijangoConstruction06.08.18 - 05.31.19 In Process70$8,100,000.00$8,400,000.00
DIP 4 - Digester Improvement Phase IIIImprovements to existing Digesters, two new digesters, fog and food waste receiving, biogas scrubbing, new flare, new digester control building, new communications, and new boilers, and related HighBret SwainConstruction10.01.18 - 05.07.19 In Process85$22,705,612.00$23,011,987.00
WQCF Alternative Energy Development-SolarRequest for Proposal for Design Build of 2.2 to 3.3 MW Solar facility South of WQCF In ProcessBret SwainContract Negotiation10.23.18 - 03.05.19 In Process90$4,900,000.00$5,534,000.00
Compressed Biogas Fueling Facility, Phase IIInstall Biogas Fueling Facility HighBret SwainConstruction03.06.18 - 03.23.19 In Process60$8,739,000.00$8,739,000.00
UV Air Conditioning SystemReplace the air condition for the UV Control LowBret SwainPS&E$313,000.00
South Plant Aeration Basin OptimizationReplace diffusers, blowers, valving and controls to reduce energy usage HighBret SwainConstruction08.14.18 - 06.27.19 In Process60$4,460,286.00$5,094,561.20
North Manteca Trunk SewerReplace existing 36-inch sewer force main with 54 inch gravity Sewer Main serving Manteca north of SR120 HighBret SwainConstruction01.10.19 - 03.11.19 Unfunded0$13,587,736.00$11,420,000.00
Food Separator InstallationInstall Food Waste Separation Equipment at Lovelace Facility HighBret SwainConstruction0$1,055,000.00$.00
Bio-Filter RehabRepair biofilters and IPS air processing MediumBret SwainDesign01.05.16 - 09.27.19 On Hold65$150,000.00$1,572,000.00
Area 1 - Water Line Replacement ProjectUpsizing water pipeline in Central MantecaAna ChionoDesign08.21.18 - 03.29.19 In Process50$358,000.00
Fire Hydrant Asset ManagementDevelop FH preventative work orders for Fire Department HighAlfredo MijangoDesign11.01.18 - 03.01.19 In Process90
WQCF SCADA Master PlanDoc existing & future SCADA, control system MediumAlfredo MijangoDesign12.27.17 - 05.01.19 In Process80$262,820.00$262,820.00
Well 28 & 29 Asset ManagementRCM, dev. PMs & asset hierarchy MediumAlfredo MijangoConstruction07.03.18 - 03.01.19 In Process70
HSIP 1 Design (Grant $1.93M)-Main St from Northgate to AlamedaImprove Pedestrian Safety, ADA, and install bike lanes In ProcessKoosun KimPlanning08.30.19 - 02.28.20 In Process80$2,149,600.00$1,934,640.00
HSIP 2 Design (Grant $681k)-Yosemite Ave from Walnut to MainImprove Pedestrian Safety, ADA, and install bike lanes In ProcessKoosun KimPlanning08.30.19 - 02.28.20 In Process80$757,300.00$681,300.00
Start from scratch
NamePersonStatusDate